The "GW9" type of outdoor high voltage disconnector applies to the corresponding voltage and current load of power systems for electrical transmission and distribution lines and equipment connected or disconnected use, in order to overhaul the power system or power failure, indemnify the security of staff. Our products are designed, manufactured and tested to the disconnector requirements of current IEC standards.
Material:polymer
Color:brown
Standard:IEC
Drawing
Basic Data
Type | GW9-10W/400 | GW9-10W/630 | |
Rated voltage | kV | 12 | 12 |
Rated Current | A | 400 | 630 |
4S Heat steady e.c. | A | 12500 | 12500 |
Shock current | A | 31500 | 31500 |
Impulse withstand voltage | To earth, kV | 75 | 75 |
Across the isolating distance, kV | 85 | 85 | |
Power frequency withstand voltage | To earth, kV | 38 | 38 |
Across the isolating distance, kV | 42 | 42 |
Beautiful shape and small size
Anti-aging and good anti-fouling and corrosion resistant ability
Light weight and easy installation
No need for periodic cleaning and maintenance
Service
Choose our products! You'll get
1) Good quality guarantee (2 years)
2) Factory direct prices
3) On time delivery
4) Free sample
5) Professional technology support
Strict quality controls have been taken to ensure that you'll get reliable products.
a. Material checks before production.
b. Random inspection during production.
c. Inspection before the shipment.
Our products fully comply with well recognized standards such as IEC, BS, ANSI.
FAQ:
1. Q: Do you have a catalog? Can you send me the catalog to have a check of all your products?
A: Yes, We have product catalog. Please contact us, we'll send our catalog by E-mail.
2 Q: I can't find the product on your catalog, can you make this product for me?
A: Our catalog shows most of our products but not all. If you couldn't find it, let us know the specification of your requirements, it usually takes 20-30 days for us to design and make new moulds which match your requirements.
3 Q: What's your payment term?
A: The price FOB Ningbo under payment term is 50% T/T in advance and the balance before shipment.